Gas cylinder connection kit for welders with hose and clamping tape

53,90 €
53,90 € 55,00 €
You save 2% (1,10 €)

Delivery in 3–15 days

Tax included. Shipping calculated at checkout.
Packaging

Gas cylinder connection kit for welders with hose and clamping tape

Connect the gas cylinder to your welder safely and without leaks. A cracked or poorly secured gas hose is a silent leak: the cylinder empties within a few days and the bead comes out porous due to lack of shielding. This kit connects the shielding gas cylinder to the welder with a flexible hose, resistant to pressure and temperature, and clamping tape.

It is the accessory you need when installing a new MIG/MAG or TIG welder, changing cylinders or replacing an old hose. Together with a gas regulator, you will have a complete installation ready for welding.

Benefits

  • Flexible hose: adapts to the position of the cylinder and the machine.
  • Resistant to pressure and temperature: designed for welding shielding gas.
  • Clamping tape included: secure, leak-free connections.
  • Quick installation: gas connected in a few minutes.

What it is for

  • Connecting the cylinder regulator to the welder's gas inlet.
  • Replacing a damaged or ageing gas hose.
  • Installing a new MIG/MAG or TIG welder.

Technical specifications

  • Contents: flexible hose + clamping tape
  • Use: connection between gas cylinder and welding machine
  • Hose: resistant to pressure and temperature
  • Supplied as: kit

Vetonek tip

Apply PTFE tape to the threads and check the connections with soapy water before starting: a small leak empties the cylinder within a few days. Always close the cylinder valve at the end of the working day.

Frequently asked questions

Is the regulator included?

No, this is the connection kit. The 2-gauge gas regulator is sold separately.

Is it suitable for MIG and TIG?

It carries the shielding gas from the cylinder to the welding machine, for both MIG/MAG and TIG.

What does the kit include?

A flexible hose resistant to pressure and temperature and clamping tape to secure the connections.

How do I check for leaks?

Open the gas and apply soapy water to the connections: if bubbles appear, tighten or reseal the thread.

How often should the gas hose be changed?

When you see cracks, hardening or cuts, or if you detect gas leaks even though the connections are properly tightened.

Frequently Asked Questions

Is the regulator included?

No, this is the connection kit. The 2-gauge gas regulator is sold separately.

Is it suitable for MIG and TIG?

It carries the shielding gas from the cylinder to the welding machine, for both MIG/MAG and TIG.

What does the kit include?

A flexible hose resistant to pressure and temperature and clamping tape to secure the connections.

How do I check for leaks?

Open the gas and apply soapy water to the connections: if bubbles appear, tighten or reseal the thread.

How often should the gas hose be changed?

When you see cracks, hardening or cuts, or if you detect gas leaks even though the connections are properly tightened.